Pre-launch · first parade June 2027
Take entries with the questions your parade actually asks. Build the running order and let it check your work. Stage a hundred entries in the right lots, print everything that has to be printed, and give the people on the kerb something worth looking at.
These aren't hypotheticals. They come from a real parade's real records — the one we're building this with.
109 entries, ordered by hand
One spreadsheet, one person, and a running order that has to satisfy a dozen unwritten rules at once. Change one entry in March and every sheet downstream is wrong.
A second form for what the first can't ask
Insurance certificates, electrical hookups, whether you're throwing candy. Today that means routing registrants out to a Google Form and reconciling two lists by hand.
Nothing for the people watching
The line-up is the single most requested thing from spectators, and it usually exists as a PDF nobody can find on the morning of the parade.
Everything below is built and in use. We've kept the list to things you could sit down and do this afternoon.
Build the form your parade actually needs — insurance certificates, hookups, trailer lengths, anything. Entrants upload documents straight into it. One link, no second form, no reconciling two lists.
Drag entries into order. Numbers stay put until you publish them, so the running order can change all March without reprinting anything.
Flags back-to-back entries from the same staging lot, unbalanced lots, and entries sitting somewhere they asked not to be. Suggestions, never rules — it never moves anything on its own.
Draw your lots once on satellite imagery. Every entry lands in a numbered box in the right row, and the sheet reprints itself when the line-up changes.
Program, announcer's script, line-up sheets, staging sheets, unit lengths, alphabetical, volunteer roster. Paper still runs parade morning and always will.
They sign in and find their line-up number, their staging lot and the directions to it — instead of chasing you for it the week before. They keep their own details up to date, too.
One link with your route, your times, the running order, and a notice you can change at eight in the morning when the start slips. Off by default; you publish what you choose.
Post the shifts, share a sign-up link, and see at a glance which corners are still uncovered.
Clone a parade and your unit types, fees, lots, registration form and maps come with it. Bring your history across from ParadeCloud or your own spreadsheet in one pass.
Named here so you know what you'd be waiting for — not so you think it's ready.
Fees attached to entry types, paid at registration, reconciled against your entries. Being built now for the 2027 season.
One person advances a marker down the line-up; entries get a text when they're five out, and the public page keeps up. Being built and rehearsed before June 2027.
City recreation departments, chambers of commerce, festival committees, and the volunteer who has done this for eleven years and has the spreadsheet to prove it. If your parade has somewhere between thirty and three hundred entries, this is built for you.